Get A Quote
large silicate ore processing line in rome

large silicate ore processing line in rome

The mining will take place between elevation 370 and 245 on 5 m benches to minimize the dilution and to maximise the mining recovery. The dilution and the ore loss per block were estimated at 5% and 4.76%, respectively. This level of dilution and ore loss is consistent with the North American mining industry

[email protected]
Sent Message Chat Online
CONTACT US

Do you need to know the product price? model? Configuration scheme? Output? Please leave your correct message and we will reply you within 24 hours.

I accept the Data Protection Declaration